Lorem ipsum dolor sit amet, consectetur adipiscing elit. Etiam eu turpis molestie, dictum est a, mattis tellus. Sed dignissim, metus nec fringilla accumsan, risus sem sollicitudin lacus, ut interdum tellus elit sed risus. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Etiam eu turpis magna, dictum est a, mattis tellus. Sed dignissim, metus nec fringilla […]

Sydney Metro Northwest

CJC Management - Sydney Metro Northwest

Overview A 4km elevated rail viaduct culminating in a 270m curved cable stay bridge, constructed from pre-cast concrete segments and placed with 2 overhead gantries. Works also included 2 large cuttings and station platforms.​ The project is valued at $12.5 billion. CJC’s Role Provision of a multi-disciplinary team across all areas of construction. In particular, […]

WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]

Sydney Yard Access Bridge

Scope The Sydney Yard Access Bridge project was the first early and enabling works package of the NSW Government’s Sydney Metro City & Southwest project. The 130m long bridge crosses five intercity lines that had never been closed under a single possession. While a full closure was planned, the main girders and cross girders were […]

Sydney Airport Civil Assets

Scope CJC Management were engaged by Sydney Airport Corporation Limited to develop a Civil Assets Manual, provide ad-hoc friction testing training, and technical advisory services across the entire airfield. A further document which covers Friction Management at the Airport was requested as part of the scope. This included training and induction into friction management activities. […]